TABLE OF CONTENTS
Air Quality
Noise
Background
Purpose of the Report
Structure of the Baseline Monitoring Report
Monitoring Requirements
Monitoring Equipment
Monitoring Locations
Monitoring Parameters, Frequency and Duration
Monitoring Methodology and QA/QC Procedure
Results and Observations
Action and Limit Levels
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters, Frequency and Duration
Monitoring Methodology and QA/QC Procedures
Results and Observations
Action and Limit Levels
4 REVISIONS
FOR INCLUSION IN THE EM&A MANUAL
LIST OF TABLES
Table 2.1 Air Quality Monitoring Equipment
Table 2.2 Air Quality Monitoring Locations
Table 2.3 Frequency and Parameters of Baseline Air Quality Monitoring
Table 2.4 Summary of Baseline 1-hour TSP Monitoring Results
Table 2.5 Summary of Baseline 24-hour TSP Monitoring Results
Table 2.6 Guidelines for Establishing Action and Limit Levels for Air Quality
Table 2.7 Action and Limit Levels for 1-hour TSP
Table 2.8 Action and Limit Levels for 24-hour TSP
Table 3.1 Location of Noise Monitoring Station
Table 3.2 Noise Monitoring Equipment
Table 3.3 Frequency and Parameters of Noise Monitoring
Table 3.4 Summary of Baseline Noise Levels
Table 3.5 Summary of Supplementary Information (L10 & L90) Obtained during Baseline Noise Monitoring
Table 3.6 Abnormal Data Collected during the Baseline Monitoring Period
Table 3.7 Action Limit Levels for Noise during Construction Period
LIST OF FIGURES
Figure 1.2 Locations of Baseline Air Quality and Noise Monitoring Stations
LIST OF APPENDICES
Appendix A1 Calibration Certificate for Air Quality Monitoring Equipment
Appendix A2 1-hour TSP Baseline Monitoring Results
Appendix A3 Graphical Presentation of Baseline 1-hour TSP Levels
Appendix A4 24-hour TSP Baseline Monitoring Results
Appendix A5 Graphical Presentation of Baseline 24-hour TSP Levels
Appendix A6 Air Pollution Index at Tai Po Monitoring Station during the Baseline Monitoring Period
Appendix B1 Copies of Calibration Certificates for Noise Monitoring Equipment
Appendix B2 Day-time 07:00-19:00hrs Baseline Noise Monitoring Data
Appendix B3 Evening-time 19:00-23:00hrs Baseline Noise Monitoring Data
Appendix B4 Holidays 07:00-2300hrs Baseline Noise Monitoring Data
Appendix B5 Night-time 23:00-07:00hrs of the next day Baseline Noise Monitoring Data
Appendix B6 Graphical Presentation of Baseline Noise Levels
Appendix C Weather Conditions during the Monitoring Period
Appendix D Baseline Monitoring Schedule
Appendix E Construction Programme