TABLE OF CONTENTS
ENVIRONMENTAL MONITORING AND AUDIT WORKS
ENVIRONMENTAL COMPLAINT AND PROSECUTION
ENVIRONMENTAL LICENSING AND PERMITTING
FUTURE KEY ISSUES
BACKGROUND
PROJECT ORGANIZATIONS
CONSTRUCTION PROGRAMME AND SYNOPSIS OF WORK
SUMMARY OF EM&A REQUIREMENTS
2. ENVIRONMENTAL
MONITORING AND AUDIT REQUIREMENTS
MONITORING PARAMETERS AND MONITORING LOCATIONS
MONITORING METHODOLOGY AND CALIBRATION DETAILS
ENVIRONMENTAL QUALITY PERFORMANCE LIMITS (ACTION AND LIMIT LEVELS)
ENVIRONMENTAL MITIGATION MEASURES
WEATHER CONDITIONS
NOISE
AIR QUALITY
LANDFILL GAS
IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURES
SITE AUDIT SUMMARY
STATUS OF ENVIRONMENTAL LICENSING AND PERMITTING
ADVICE ON WASTE MANAGEMENT STATUS
SUMMARY OF EXCEEDANCES
ENVIRONMENTAL COMPLAINT AND PROSECUTION
REVIEW OF THE REASONS FOR AND THE IMPLICATIONS OF NON-COMPLIANCE
7. COMMENTS,
CONCLUSIONS AND RECOMMENDATIONS
LIST OF TABLE
Table I Summary Table for Events Recorded in the Reporting Quarter
Table 1.1 Key Project Contacts
Table 4.1 Observations and Recommendations of Site Audit
LIST OF FIGURES
Figure 1.2 Location of Air Quality and Noise Monitoring Stations
LIST OF APPENDICES
Appendix A Construction Programme
Appendix B Monitoring Requirements
Appendix C Action and Limit Levels
Appendix D Graphical Presentation of Noise Monitoring Results
Appendix E Graphical Presentation of 1-hr TSP Monitoring Results
Appendix F Graphical Presentation of 24-hr TSP Monitoring Results
Appendix G Implementation Status of Environmental Mitigation Measures (EMIS)
Appendix H Summary Status of Environmental Licences and Permits
Appendix I Waste Generation in the Reporting Quarter